Declare his glory among the nations, his marvelous deeds among all peoples.

Psalm 96.3 (NIV)

Dining Room

06/08/08

Home
Anchor
Above Bridge
Aft Crane
Atrium/Cafe
Bow
Bridge
CT Scanner
Deck 7
Deck 8
Dining Room
Engine Room
Family Cabin
4 Person Cabin
Funnel
Hatches
International Louge
My Cabin
Radar
Reception
Recovery Room
Ropes Locker
2 Person Cabin

 

The linoleum is installed in the dining room. I confess it reminds me of a bowl of tomato soup. The top photo is of the dining room, but the tables were removed for the commissioning on April 6, 2006. The chairs are destined for the International Lounge, one deck above. The third photo is by Chris Bamber and shows the tables in place.
back
Serving Line installation in progress.

 

After the linoleum was installed, it was covered with hardboard to protect it.

back

Home | Anchor | Above Bridge | Aft Crane | Atrium/Cafe | Bow | Bridge | CT Scanner | Deck 7 | Deck 8 | Dining Room | Engine Room | Family Cabin | 4 Person Cabin | Funnel | Hatches | International Louge | My Cabin | Radar | Reception | Recovery Room | Ropes Locker | 2 Person Cabin

This site was last updated 04/18/06